Sunday, September 3, 2017

Knitting Goal Met

This afternoon I slowly knitted the crown of a pink newborn hat that I have been working on the past several weeks. It has been my Slow Stitching Sunday goal. The slow part was switching from a circular needle to DPNs. I found it to be a personal challenge.
With a satisfactory result after several previous not-so-good hat attempts, I'm going to take a hat knitting break and find another needlework project. Knitting in the round on a circular needle is relaxing; the DPNs are cumbersome. Next time I will try the magic loop method for decreasing.

Happy Labor Day to us in the States and our Canadian neighbors.

Jill



Knitting Goal Met

This afternoon I slowly knitted the crown of a pink newborn hat that I have been working on the past several weeks. It has been my Slow Stitching Sunday goal. The slow part was switching from a circular needle to DPNs. I found it to be a personal challenge.
With a satisfactory result after several previous not-so-good hat attempts, I'm going to take a hat knitting break and find another needlework project. Knitting in the round on a circular needle is relaxing; the DPNs are cumbersome. Next time I will try the magic loop method for decreasing.

Happy Labor Day to us in the States and our Canadian neighbors.

Jill